Air conditioning installation check list

Please take a few moments to go over some of the things it will help too be aware off

Air conditioning installation check list

Arrival

We will let you know the day before the approx time of arrival usually between 8-9.00am.

We will call you 5 minutes before arrival so you can come down and meet us at the entrance. We will need you to guide us into a parking space inside the building as close to the elevator as possible.

Rubbish removal

All cardboard and packaging will be cut up and neatly stacked next to your recycle bin.

Noise

You may need to let body corp aware that if we need to be drilling through brick or concrete it will be intermitenatly noisy. We will let you know if it is brick or concrete during the quoting stage.